New Build permit
2010-2012 BATHURST ST
Toronto , Ontario
- Issued
- Issued Sep 27, 2023
- Project type
- New Build
- Status
- Issued
Activity at this address
5 permits since 2022
Most recent activity: Sep 2023
This permit is one of 5 permits filed at this address.
Revision history
6 revisions on file · 2022–2025
-
Revision issued Rev 05 Issued Oct 07, 2025
REV: 8 storey residential apartment building with 3 levels of U/G parking, this is an amendment to existing permit #21-191566 BLD 00 NB. interior alterations at 2 and 6. Proposed 9th storey vestibule … Read full revision note Show less
REV: 8 storey residential apartment building with 3 levels of U/G parking, this is an amendment to existing permit #21-191566 BLD 00 NB. interior alterations at 2 and 6. Proposed 9th storey vestibule addition no longer proposed through this revision. 06 revision expected following CoA approval. Proposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
-
Revision issued Rev 04 Issued Mar 07, 2025
Revision #4: Fire supression sprinkler system.Revision # 3 - revise Suites 1C and 1B. The ground floor of Suite 1C will be combined with the ground aand 2nd levels of Suite 1B and will remain a 1B and… Read full revision note Show less
Revision #4: Fire supression sprinkler system.Revision # 3 - revise Suites 1C and 1B. The ground floor of Suite 1C will be combined with the ground aand 2nd levels of Suite 1B and will remain a 1B and Den. The original 2nd level of 1C will remain, and now be designated as 2E, and is being modified to a stand-alone 1B+Den unit. (see cover letter)REVISION 2 - fire supression sprinkler systemProposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
-
Revision issued Rev 03 Issued Nov 07, 2024
Revision # 3 - revise Suites 1C and 1B. The ground floor of Suite 1C will be combined with the ground aand 2nd levels of Suite 1B and will remain a 1B and Den. The original 2nd level of 1C will remain… Read full revision note Show less
Revision # 3 - revise Suites 1C and 1B. The ground floor of Suite 1C will be combined with the ground aand 2nd levels of Suite 1B and will remain a 1B and Den. The original 2nd level of 1C will remain, and now be designated as 2E, and is being modified to a stand-alone 1B+Den unit. (see cover letter)REVISION 2 - fire supression sprinkler systemProposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
-
Revision issued Rev 02 Issued Sep 27, 2023
REVISION 2 - fire supression sprinkler systemProposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
-
Revision issued Rev 01 Issued Nov 02, 2022
Revision 01: Amendment to Shoring for Building Permit 21-191566-BLD-00-NBProposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
-
Inspection Rev 00 Issued Sep 15, 2022
Proposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Sep 27, 2023
- Project value
- —
- Project type
- New Build
- Building type
- Multi Family
- Description
- REVISION 2 - fire supression sprinkler systemProposal to construct a nine storey, 25 unit, residential condo apartment building with three levels of underground parking.
- Builder name
- —
- Permit status
- Issued City's exact wording: Revision Issued
- Work type
- New Building
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.