New Build permit
150 COLLEGE ST
Toronto , Ontario
- Issued
- Issued Dec 04, 2024
- Project type
- New Build
- Status
- Issued
Activity at this address
386 permits since 1995
Most recent activity: Jun 2026
This permit is one of 386 permits filed at this address.
Revision history
4 revisions on file · 2022–2024
-
Revision issued Rev 03 Issued Dec 04, 2024
Revision 02 0 HVA - Unforeseen Existing Site Condition requiring relocation of EDS Pit and Level 10 Penthouse revisions, and subsequent follow-on impacts to above ground room relocations, and associat… Read full revision note Show less
Revision 02 0 HVA - Unforeseen Existing Site Condition requiring relocation of EDS Pit and Level 10 Penthouse revisions, and subsequent follow-on impacts to above ground room relocations, and associated servicesMain reason for this permit changes are:1. Client / UofT’s request design changes to provide access platform at all levels within the new mechanical shaft for future maintenance and access. 2. Unforeseen existing site condition requiring relocation of EDS pit and subsequent drainage lines routing to EDS Pit location. 3. Unforeseen existing site condition correction to elevator Pit drainage system to meet code requirements. 4. West pit and utility tunnel connection revision due to unforeseen site conditions related to existing underground utilities. Refer to attached write up for more detail changes to each drawing that was issued as part of this permit revision.Revision 01: HVAC - Proposal for interior alterations to the existing Level 1 (Basement) of the Medical Sciences Building (MSB) at the University of Toronto to incorporate an Emerging and Pandemic Infections Centre (EPIC) whose laboratories, office spaces, support spaces, and washrooms will require their own mechanical and electrical infrastructure that are independent from the rest of the building. Therefore, a new 719 sm. mechanical service penthouse is also required to be constructed on the existing roof of the MSB.
-
Revision issued Rev 02 Issued Jul 25, 2024
Revision 02 0 HVA - Unforeseen Existing Site Condition requiring relocation of EDS Pit and Level 10 Penthouse revisions, and subsequent follow-on impacts to above ground room relocations, and associat… Read full revision note Show less
Revision 02 0 HVA - Unforeseen Existing Site Condition requiring relocation of EDS Pit and Level 10 Penthouse revisions, and subsequent follow-on impacts to above ground room relocations, and associated servicesMain reason for this permit changes are:1. Client / UofT’s request design changes to provide access platform at all levels within the new mechanical shaft for future maintenance and access. 2. Unforeseen existing site condition requiring relocation of EDS pit and subsequent drainage lines routing to EDS Pit location. 3. Unforeseen existing site condition correction to elevator Pit drainage system to meet code requirements. 4. West pit and utility tunnel connection revision due to unforeseen site conditions related to existing underground utilities. Refer to attached write up for more detail changes to each drawing that was issued as part of this permit revision.Revision 01: HVAC - Proposal for interior alterations to the existing Level 1 (Basement) of the Medical Sciences Building (MSB) at the University of Toronto to incorporate an Emerging and Pandemic Infections Centre (EPIC) whose laboratories, office spaces, support spaces, and washrooms will require their own mechanical and electrical infrastructure that are independent from the rest of the building. Therefore, a new 719 sm. mechanical service penthouse is also required to be constructed on the existing roof of the MSB.
-
Revision issued Rev 01 Issued Apr 25, 2024
Main reason for this permit changes are:1. Client / UofT’s request design changes to provide access platform at all levels within the new mechanical shaft for future maintenance and access. 2. Unfores… Read full revision note Show less
Main reason for this permit changes are:1. Client / UofT’s request design changes to provide access platform at all levels within the new mechanical shaft for future maintenance and access. 2. Unforeseen existing site condition requiring relocation of EDS pit and subsequent drainage lines routing to EDS Pit location. 3. Unforeseen existing site condition correction to elevator Pit drainage system to meet code requirements. 4. West pit and utility tunnel connection revision due to unforeseen site conditions related to existing underground utilities. Refer to attached write up for more detail changes to each drawing that was issued as part of this permit revision.Revision 01: HVAC - Proposal for interior alterations to the existing Level 1 (Basement) of the Medical Sciences Building (MSB) at the University of Toronto to incorporate an Emerging and Pandemic Infections Centre (EPIC) whose laboratories, office spaces, support spaces, and washrooms will require their own mechanical and electrical infrastructure that are independent from the rest of the building. Therefore, a new 719 sm. mechanical service penthouse is also required to be constructed on the existing roof of the MSB.
-
Inspection Rev 00 Issued Aug 05, 2022
HVAC - Proposal for interior alterations to the existing Level 1 (Basement) of the Medical Sciences Building (MSB) at the University of Toronto to incorporate an Emerging and Pandemic Infections Centr… Read full revision note Show less
HVAC - Proposal for interior alterations to the existing Level 1 (Basement) of the Medical Sciences Building (MSB) at the University of Toronto to incorporate an Emerging and Pandemic Infections Centre (EPIC) whose laboratories, office spaces, support spaces, and washrooms will require their own mechanical and electrical infrastructure that are independent from the rest of the building. Therefore, a new 719 sm. mechanical service penthouse is also required to be constructed on the existing roof of the MSB.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Dec 04, 2024
- Project value
- —
- Project type
- New Build
- Building type
- —
- Commercial category
- Institutional
- Description
- Revision 02 0 HVA - Unforeseen Existing Site Condition requiring relocation of EDS Pit and Level 10 Penthouse revisions, and subsequent follow-on impacts to above ground room relocations, and associated servicesMain reason for this permit changes are:1. Client / UofT’s request design changes to provide access platform at all levels within the new mechanical shaft for future maintenance and access. 2. Unforeseen existing site condition requiring relocation of EDS pit and subsequent drainage lines routing to EDS Pit location. 3. Unforeseen existing site condition correction to elevator Pit drainage system to meet code requirements. 4. West pit and utility tunnel connection revision due to unforeseen site conditions related to existing underground utilities. Refer to attached write up for more detail changes to each drawing that was issued as part of this permit revision.Revision 01: HVAC - Proposal for interior alterations to the existing Level 1 (Basement) of the Medical Sciences Building (MSB) at the University of Toronto to incorporate an Emerging and Pandemic Infections Centre (EPIC) whose laboratories, office spaces, support spaces, and washrooms will require their own mechanical and electrical infrastructure that are independent from the rest of the building. Therefore, a new 719 sm. mechanical service penthouse is also required to be constructed on the existing roof of the MSB.
- Builder name
- —
- Permit status
- Issued City's exact wording: Revision Issued
- Work type
- Mechanical(MS)
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.