New Build permit
6 HOSKIN AVE
Toronto , Ontario
- Issued
- Issued Mar 16, 2026
- Project type
- New Build
- Status
- Completed
Activity at this address
29 permits since 2001
Most recent activity: Mar 2026
This permit is one of 29 permits filed at this address.
Revision history
6 revisions on file · 2023–2026
-
Revision issued Rev 02 Issued Mar 16, 2026
REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to … Read full revision note Show less
REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
-
Closed Rev 02 Issued Mar 16, 2026
REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to … Read full revision note Show less
REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
-
Revision issued Rev 01 Issued Aug 11, 2025
Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate ou… Read full revision note Show less
Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
-
Closed Rev 01 Issued Aug 11, 2025
Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate ou… Read full revision note Show less
Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
-
Inspection Rev 00 Issued Apr 25, 2023
HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, … Read full revision note Show less
HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
-
Closed Rev 00 Issued Apr 25, 2023
HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, … Read full revision note Show less
HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Mar 16, 2026
- Project value
- —
- Project type
- New Build
- Building type
- —
- Description
- REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
- Builder name
- —
- Permit status
- Completed City's exact wording: Closed
- Work type
- Mechanical(MS)
- Completed
- 2026-05-29
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.