New Build permit

6 HOSKIN AVE

Toronto , Ontario

Issued
Issued Mar 16, 2026
Project type
New Build
Status
Completed

Activity at this address

29 permits since 2001

Most recent activity: Mar 2026

Institutional

This permit is one of 29 permits filed at this address.

6 4 2 0 2015 2016 2018 2021 2022 2023 2024 2026
See everything happening at this address · 29 permits
Permit No. 21 187496 HVA Currently completed

Revision history

6 revisions on file · 2023–2026

  1. Revision issued Rev 02 Issued Mar 16, 2026
    REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to … Read full revision note

    REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

  2. Closed Rev 02 Issued Mar 16, 2026
    REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to … Read full revision note

    REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

  3. Revision issued Rev 01 Issued Aug 11, 2025
    Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate ou… Read full revision note

    Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

  4. Closed Rev 01 Issued Aug 11, 2025
    Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate ou… Read full revision note

    Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

  5. Inspection Rev 00 Issued Apr 25, 2023
    HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, … Read full revision note

    HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

  6. Closed Rev 00 Issued Apr 25, 2023
    HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, … Read full revision note

    HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Mar 16, 2026
Project value
Project type
New Build
Building type
Description
REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Mechanical(MS)
Completed
2026-05-29
References & corrections IDs · source · attribution
Permit ID 21 187496 HVA
Full address 6 Hoskin Avenue, Toronto, Ontario, M5S 3H3, Toronto, M5S 3H3
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.