New Build permit

25 HARBORD ST

Toronto , Ontario

Issued
Issued Aug 29, 2023
Project type
New Build
Status
Issued

Activity at this address

8 permits since 2015

Most recent activity: Apr 2026

Institutional

This permit is one of 8 permits filed at this address.

3 2 1 0 2015 2016 2017 2023 2026
See everything happening at this address · 8 permits
Permit No. 23 147227 HVA Currently issued

Revision history

4 revisions on file · 2023–2025

  1. Revision issued Rev 03 Issued Dec 03, 2025
    Revision - for exhaust duct fire-wrapped within the mechanical fire rated shafts, see attached list.REV HVAC - The project includes the interior alteration of a portion of multiple floor areas within … Read full revision note

    Revision - for exhaust duct fire-wrapped within the mechanical fire rated shafts, see attached list.REV HVAC - The project includes the interior alteration of a portion of multiple floor areas within the existing University building to accommodate laboratory, classroom, office and lounge spaces. Floor areas will be partially renovated or repaired on the ground floor, levels 1, 4, 5 & 7. The existing building is classified as containing a Group A, Division 2 (assembly) major occupancy and includes Group F, Division 2 (laboratory), Group D (office) and Group F, Division 3 (building service and storage) occupancies. Proposal for demolition permit only. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work

  2. Revision issued Rev 02 Issued Apr 22, 2025
    REV HVAC - The project includes the interior alteration of a portion of multiple floor areas within the existing University building to accommodate laboratory, classroom, office and lounge spaces. Flo… Read full revision note

    REV HVAC - The project includes the interior alteration of a portion of multiple floor areas within the existing University building to accommodate laboratory, classroom, office and lounge spaces. Floor areas will be partially renovated or repaired on the ground floor, levels 1, 4, 5 & 7. The existing building is classified as containing a Group A, Division 2 (assembly) major occupancy and includes Group F, Division 2 (laboratory), Group D (office) and Group F, Division 3 (building service and storage) occupancies. Proposal for demolition permit only. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work

  3. Revision issued Rev 01 Issued Dec 07, 2023

    REVISION - Interior alterations /fit-up to Ramsay Wright DLB Labs project

  4. Inspection Rev 00 Issued Aug 29, 2023

    HVAC - Proposal for demolition permit only. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Aug 29, 2023
Project value
Project type
New Build
Building type
Commercial category
Institutional
Description
HVAC - Proposal for demolition permit only. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work
Builder name
Permit status
Issued City's exact wording: Inspection
Work type
Mechanical(MS)
References & corrections IDs · source · attribution
Permit ID 23 147227 HVA
Full address 25 Harbord Street, Toronto, Ontario, M5S 3J6, Toronto, M5S 3J6
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.