In Fairview: 5 permits in the last 7 days · General-heavy . See area activity →
Field Review - Addition / Alteration - 2nd/3rd Floor Interior alterations for a new creative office with ancillary lab on the 2nd/ 3rd floor of this existing commercial building on the site as per Operational Letter by Lululemon Athletica on April 19, 2023 Scope of works: Removing interior walls and Proposed alongside those are other typical office amenity areas (staff rooms, meeting rooms, fitness room) and larger open office workstations Existing tenant: Lululemon Athletica Ltd. OK for use as per A. Wroblewski on March 31, 2023 OK for Field Review as per S.Yu on May 9, 2023 This building is sprinklered. A separate sprinkler permit is required for all related work. Note: - Maximum Occupant Load is 77 persons. Permanent sign indicating the occupant load will be provided - Schedule A+B - Arch.: David N Palmer, Architect AIBC, 604-687-2511 (Gustavson Wylie Architects Inc.) - Schedule B - Mech/Plumb.: Daryl Keturakis, P. Eng. 604-591-2766 (Bycar Engineering Ltd.) - Schedule B - Elec.: Dave Hans, P. Eng., 604-999-2069 (EMEC Design Group Ltd.) Separate permit(s) will be required for any future tenant improvements to either suite. Shelving units shall not be more than 6'H. A structural engineer is required if the shelving units are more than 6'H. Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trade's permits (e.g. electrical and plumbing)
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
1523 W 3rd Ave, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther work by David Palmer DBA: Gustavson Wylie Architects Inc
View all →1523 W 3rd Ave, Vancouver, BC, Vancouver
Show on map with nearby permits PRO