In Downtown: 14 permits in the last 7 days · Electrical-heavy . See area activity →
Field Review - Addition / Alteration - 34th floor - east half Interior alterations to provide improvements to the east half of the 34th floor for an existing full floor office tenant on the 34th floor in this existing commercial building. Scope of work: demo to the east half for new layout, new partition walls, doors, new kitchen, lighting, millwork, finishes. Electrical, Plumbing, Sprinklers to suit. * Existing AL for maglocks * Existing inter-connecting stairs from 30th-34th floors REVISION #1: SEE APPROVED PERMIT AMENDMENT(S) SECTION OF PERMIT FOR DESCRIPTION B.Wong - Nov 7/23 REVISION #2: SEE APPROVED PERMIT AMENDMENT(S) SECTION OF PERMIT FOR DESCRIPTION B.Wong - Apr 24/24 REVISION #3: - To update occupant load and egress - To update the floor plan at the north-east corner of the office and electrical to suit B.Wong - Jun 17/24 OK for Field Review per W. Wong. Letters of Assurance: Schedule A - Jason Santeford, Architect AIBC. Ph#604334.4774 Architectural Schedule B - Jason Santeford, Architect AIBC. Ph#604334.4774 Structural Schedule B by - Colin Macmillan, P. Eng. ph#604.738.0048 Electrical Schedule B by - Jose Lius Lopez, P.Eng. ph#604.687.1800 (ended Oct 5/23) Electrical Schedule B by - Derek Hui, P.Eng, ph#604-687-1800 (started Oct 5/23) Mechanical/Plumbing Schedule B by - Eric Cresswell, P.Eng. ph#604.687.5995. E2 - Lighting - Upgrade to Bilevel Lighting Control (per 9.4.1.1.(d) of ASHRAE 90.1-2016)\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
550 Burrard St, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Novacom Building Partners Ltd
View all →More opportunities in Downtown this week
View all →550 Burrard St, Vancouver, BC, Vancouver
Show on map with nearby permits PRO