Renovation permit
623 KINGSWAY
Vancouver , British Columbia
- Issued
- Issued Sep 14, 2022
- Project type
- Renovation
- Value
- $20K
- Status
- Issued
Activity at this address
2 permits since 2017
Most recent activity: Sep 2022
Renovation
This permit is one of 2 permits filed at this address.
Permit details
The municipal record for this permit.
Trades
Electrical
HVAC
Plumbing
Windows & Doors
Foundation / Structural
Insulation
- Issue date
- Sep 14, 2022
- Project value
- $20K
- Project type
- Renovation
- Building type
- —
- Commercial category
- Personal Service
- Description
- Field Review - Addition / Alteration - Interior alterations to provide improvements to this existing Beauty and Wellness on the ground floor of this exiting mixed use building on this site. Scope of work includes the removal and addition of interior walls, revised lighting layout and new millwork. Tenant Name: Liveo Beauty Related to DP-2020-00794 OK for field review per Kirat Kang - July 18, 2022. Notes: - Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) - This building is not sprinklered. - DBI to determine on site if a Schedule B, Structural, is required. - No translucent or opaque film, artwork, posters, shelving, display cases or similar elements are to be installed on or directly outside or inside of the approved glazing frontages and windows so that the interior of the premises is visible at all times from the sidewalk. - Maximum occupant load: 10 persons. A permanent sign with lettering not less than 50mm high with a 12mm stroke must be placed at the front entrance indicating the max occupant load. Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
- Contractor
- Ark and Mason Design Ltd
- Permit status
- Issued
- Applicant
- Toby Lee DBA: Ark and Mason Design
References & corrections IDs · source · attribution
Permit ID
BP-2022-03634
Full address
623 Kingsway, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from Ark and Mason Design Ltd
10 other permits on record.