In Renfrew-Collingwood: 4 permits in the last 7 days · Demolition-heavy . See area activity →
Field Review - Addition / Alteration - Ground Floor Interior alterations to provide improvements to this existing office space for a new office tenant (sales office) on the ground floor of this existing commercial building. Scope of work: Remove existing partitions, doors, floor finishes and millwork. Construct new walls, carpet, kitchen appliances and fixtures for display and electrical work. REVISION #1: interior layout changes. Feb. 13, 2023 mlh TENANT: Earles Street Limited Partnership Architectural Schedule B submitted by Hugh Cochlin, Architect AIBC, ph: 604-879-0118 E2 - lighting (1) Upgrade to local control (per 9.4.1.1 (a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
2700 Kingsway, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Mansouri Enterprises Inc
View all →More opportunities in Renfrew-Collingwood this week
View all →2700 Kingsway, Vancouver, BC, Vancouver
Show on map with nearby permits PRO