In Downtown: 14 permits in the last 7 days · Electrical-heavy . See area activity →
Field Review - Addition / Alteration - #220 - 2nd floor (expanding into a portion of #210) Interior alterations to provide improvements for an existing office tenant on the 2nd floor (#220) to expand into a portion of #210 in this existing commercial building on this site. Scope of work: remove one demising wall, a build a new demising wall between two units. REVIION #1 - Sept.9/24 mk - modify demising wall REVISION #2 - Oct 31/24 - add tenant fit out to scope of work. Electrical & Mechanical to suit. Mechanical Schedule B by Matthew Clayton, P. Eng. ph#(604) 687 1821 Letters of Assurance submitted; -Schedule A and Architectural Schedule B submitted by James Emery, Architect, AIBC. ph#604-736-5581. -Electrical Schedule B by Seyyedehsara Hosseinimighan, P.Eng. ph# 604-687-1821. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Water Street Garage, 12, Water Street, Gastown, Downtown, Vancouver, Metro Vancouver Regional District, British Columbia, Vancouver, V6B 1A5
Show on map with nearby permits PROOther permits at this address
Other work by JAMES EMERY DBA: IREDALE ARCHITECTURE
View all →More opportunities in Downtown this week
View all →Water Street Garage, 12, Water Street, Gastown, Downtown, Vancouver, Metro Vancouver Regional District, British Columbia, Vancouver, V6B 1A5
Show on map with nearby permits PRO