In Downtown: 14 permits in the last 7 days · Electrical-heavy . See area activity →
Field Review - Addition / Alteration - #300 - 3rd floor (full floor tenant) Interior alterations to provide improvements for a new full floor office tenant on the 3rd floor (#300) in this existing commercial building on this site. Scope of work: remove/construct partition walls, millwork, finishes, lighting, power & data plan, electrical, plumbing and sprinkler work. TENANT: Productboard Inc. Schedule A and Architectural Schedule B submitted by Ken G. Wong, AIBC ph: 604-689-4549 OK for field review as per K. Vogt; Jan. 20, 2022 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per 9.4.1.1.(h) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Labor Temple, 411, Dunsmuir Street, Downtown, Vancouver, Metro Vancouver Regional District, British Columbia, V6B, Vancouver, V6B
Show on map with nearby permits PROOther permits at this address
Other work by Allspaces Design & Management Ltd
View all →More opportunities in Downtown this week
View all →Labor Temple, 411, Dunsmuir Street, Downtown, Vancouver, Metro Vancouver Regional District, British Columbia, V6B, Vancouver, V6B
Show on map with nearby permits PRO