Revision issued Rev 02 Issued Apr 28, 2026
REV 02: for the relocation of sanitary (SAN) and storm (STM) works at the Scarborough Health Network. Please refer to Revision C04 for details of the changes. Due to insufficient horizontal separation… Read full revision note Show less
REV 02: for the relocation of sanitary (SAN) and storm (STM) works at the Scarborough Health Network. Please refer to Revision C04 for details of the changes. Due to insufficient horizontal separation between the storm and sanitary sewers (only 70 cm), installing two separate manholes was not possible.so MH 18 is now proposed as a dual manhole.Revision 01 - relocation of the sanitary and storm works at the SHN (Scarborough Health Network- General Hospital) for the SSEThe existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are currently in conflict with the SOE footprint. In this scope, these pipes will be re-routed to the north running along the west D-Wall and be connected to ex. SAN and STM lines running along McCowan
-
Revision issued Rev 01 Issued Dec 01, 2025
Revision 01 - relocation of the sanitary and storm works at the SHN (Scarborough Health Network- General Hospital) for the SSEThe existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are… Read full revision note Show less
Revision 01 - relocation of the sanitary and storm works at the SHN (Scarborough Health Network- General Hospital) for the SSEThe existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are currently in conflict with the SOE footprint. In this scope, these pipes will be re-routed to the north running along the west D-Wall and be connected to ex. SAN and STM lines running along McCowan
-
Inspection Rev 00 Issued Jun 10, 2025
The existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are currently in conflict with the SOE footprint. In this scope, these pipes will be re-routed to the north running along the wes… Read full revision note Show less
The existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are currently in conflict with the SOE footprint. In this scope, these pipes will be re-routed to the north running along the west D-Wall and be connected to ex. SAN and STM lines running along McCowan
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Apr 28, 2026
- Project value
- —
- Project type
- —
- Building type
- —
- Description
- REV 02: for the relocation of sanitary (SAN) and storm (STM) works at the Scarborough Health Network. Please refer to Revision C04 for details of the changes. Due to insufficient horizontal separation between the storm and sanitary sewers (only 70 cm), installing two separate manholes was not possible.so MH 18 is now proposed as a dual manhole.Revision 01 - relocation of the sanitary and storm works at the SHN (Scarborough Health Network- General Hospital) for the SSEThe existing 250 - 300MMØ SAN and 300-400MMØ STM near the CKD building are currently in conflict with the SOE footprint. In this scope, these pipes will be re-routed to the north running along the west D-Wall and be connected to ex. SAN and STM lines running along McCowan
- Builder name
- —
- Permit status
- Issued City's exact wording: Revision Issued
- Work type
- Drain and Site Service
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.