In Arbutus Ridge: 2 permits in the last 7 days · Demolition-heavy . See area activity →
Field Review - Addition / Alteration - #201 - 2nd floor Interior alterations to this existing School - Arts or Self Improvement tenant on the 2nd floor (#201) in this existing commercial building on this site. REVISION #1: Interior layout changes. Sept. 21, 2022 mlh Ok for Field Review per A. Patterson; June 27, 2022 NOTES: Building Not Sprinklered - No sprinkler inspection or permit required. DBI to determine on site if a Structural Schedule B is required. E2 Upgrade - Lighting - Upgrade to incorporate Automatic Full OFF (per 9.4.1.1.(h) of ASHRAE 90.1-2016). Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
2445 W 41st Ave, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Muhammed Nazeer Bawa / Ewan Construction DBA: EWAN
View all →More opportunities in Arbutus Ridge this week
View all →2445 W 41st Ave, Vancouver, BC, Vancouver
Show on map with nearby permits PRO