Field Review - Addition / Alteration - #200 - 2nd floor (full floor tenant) Interior alterations to provide improvements for this existing full floor office tenant on the 2nd floor (#200) of this existing commercial building on this site. Scope of work: construct new partition walls/doors to create 3 office rooms, finishes, electrical and sprinkler work. TENANT: 3VGeomatics REVISION #1: Cancel t-bar ceiling, existing open ceiling to remain. - May 23/23 - LLL Letter of Assurance submitted by: Architectural/Mechanical/Electrical Schedule B, Amir Abbasinik, P.Eng., M.Eng. ph#604.727.3639. E-2 upgrade - Lighting #1 upgraded to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1.-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
2233 Columbia St, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Barbara Smyth DBA: VOD Office Design
View all →2233 Columbia St, Vancouver, BC, Vancouver
Show on map with nearby permits PRO