In Downtown: 17 permits in the last 7 days · Electrical-heavy . See neighbourhood activity →
Field Review - Addition / Alteration - 22nd floor Elevator lobby and corridor Interior alterations to provide improvements to the existing elevator lobby and corridors on the 22nd floor of this existing commercial building. Scope of work: Renovation of drywall and ceiling to add height and space and updates to flooring and wall finishes. Electrical, Mechanical to suit. Revision #1 - revise drawings to show existing corridor. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Letters of Assurance submitted: - Schedule A and Architectural Schedule B by - Sadaf Alerassoul , Architect, AIBC. ph#604-687-2990. - Electrical Schedule B - Sukhdeep Dhaliwal, P.Eng.. ph#604-609-0500 x108. - Mech/Plumbing Schedule B by Ronald Braun, M.Sc., P.Eng. ph#604-609-0500. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
1050 W Pender St, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Prentice Chien
View all →More opportunities in Downtown this week
View all →1050 W Pender St, Vancouver, BC, Vancouver
Show on map with nearby permits PRO