CanPermits
Back to Yonge-Bay Corridor

200 Bay St

Yonge-Bay Corridor · City of Toronto

Office Retail Restaurant

1413

Permits observed

Since 1998

1998

Active since

First filing: Jul 1998

May 11, 2026

Latest filing

1

Contractors involved

Across all filings

Permit timeline

Chronological history of commercial permits and filings.

  1. 26 141151 HVA
    Building Renovation

    HVAC - interior alterations

  2. Building Renovation

    Plumbing - Proposal for interior alterations to existing office

  3. Building Renovation

    HVAC - Proposal for interior alterations to existing office

  4. Building Renovation

    Proposal for interior alterations to existing office

  5. Apr 29, 2026

    interior alterations

    26 141151 BLD
    Building Renovation

    interior alterations

  6. Building Renovation

    Proposal for interior alterations to revert 39th floor back to base.

  7. Building Renovation

    HVAC - Proposal for interior alterations to revert 39th floor back to base.

  8. Building Renovation

    Plumbing - Proposal for interior alterations to revert 39th floor back to base.

View older filings (32)
  1. Plumbing - Proposal for interior alterations on North Tower, 13th floor offices.

  2. HVAC - Proposal for interior alterations on North Tower, 13th floor offices.

  3. Proposal for interior alterations on North Tower, 13th floor offices.

  4. Plumbing - Proposal for interior alterations to 16th floor.

  5. Proposal for interior alterations to 16th floor.

  6. HVAC - Proposed interior alteration to the existing office space.

  7. Proposed interior alteration to the existing office space.

  8. HVAC - Proposed interior alteration of retail food service

  9. Proposed interior alteration of retail food service

  10. Revision: delete removal of existing ceiling, delete renovation of Men & Women's Washrooms

  11. 26 102270 HVA

    HVAC - Proposal for interior alterations.

  12. Plumbing - Proposal for interior alterations.

  13. Revision: delete removal of existing ceiling, delete renovation of Men & Women's Washrooms

  14. Proposal for interior alterations on the 23rd floor

  15. Plumbing - Proposal to interior alterations for Back to Base. North Tower: Level 6,7,8,14,15,17 , South Tower: Level 15,23,39

  16. HVAC - Proposal to interior alterations for Back to Base. North Tower: Level 6,7,8,14,15,17 , South Tower: Level 15,23,39

  17. Proposal to interior alterations for Back to Base. North Tower: Level 6,7,8,14,15,17 , South Tower: Level 15,23,39

  18. Plumbing - Proposed demolition of existing interior finishes, non-demising and non-loadbearing walls. Construction of new interior layout for tenant. Plumbing and HVAC work to…

  19. HVAC - Proposed demolition of existing interior finishes, non-demising and non-loadbearing walls. Construction of new interior layout for tenant. Plumbing and HVAC work to suit.

  20. Proposed demolition of existing interior finishes, non-demising and non-loadbearing walls. Construction of new interior layout for tenant. Plumbing and HVAC work to suit.

  21. Plumbing - Interior alterations to existing space. Floor 22S.

  22. HVAC - Interior alterations to existing space. Floor 22S.

  23. Interior alterations to existing space. Floor 22S.

  24. Plumbing - Proposal for new layout to accommodate Sprott Events Area. Replace existing ceiling grid with new base building standard and drywall ceilings. New lighting to buildi…

  25. HVAC - Proposal for new layout to accommodate Sprott Events Area. Replace existing ceiling grid with new base building standard and drywall ceilings. New lighting to building st…

  26. Plumbing - Proposal for interior alterations for existing MCI tenant space, re-demising partitions and new corridor.

  27. HVAC - Proposal for interior alterations for existing MCI tenant space, re-demising partitions and new corridor.

  28. Proposal for interior alterations for existing MCI tenant space, re-demising partitions and new corridor.

  29. Revision 01: Revised Egress and exit sign locations and electrial plan. Interior alterations to existing office - South Tower Suite 800

  30. Proposal for new layout to accommodate Sprott Events Area. Replace existing ceiling grid with new base building standard and drywall ceilings. New lighting to building standard…

  31. Proposal for interior alterations (Sprinkler)

  32. Proposal to install thirteen (13) maglocks on 8th floor Suite 800 South Tower

Activity continuity summary

1413 commercial filings observed

Since 1998

Most filings were office-related

Tier 2 category mix

Recent activity visible across multiple years

Spans 1998–2026

Within the last 90 days, a business has been emerging at this address — 3 business-emergence signals recorded.

Add this address's neighbourhood to a territory to see details (operating name, source category, lifecycle dates).

Related contractors

Business emergence insights

Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.

Nearby related activity

Explore neighbourhood activity
  • Commercial activity observed across Yonge-Bay Corridor.
  • Multiple interior renovations in the surrounding blocks.
  • Patio and signage activity consistent along the corridor.