CanPermits
Back to St Lawrence-East Bayfront-The Islands

61 Front St W

St Lawrence-East Bayfront-The Islands · City of Toronto

Institutional Retail Restaurant

245

Permits observed

Since 1999

1999

Active since

First filing: Oct 1999

May 5, 2026

Latest filing

1

Contractors involved

Across all filings

Permit timeline

Chronological history of commercial permits and filings.

  1. 26 140307 MSA
    Building Other

    Kitchen exhaust damper installation

  2. Building New Build

    Proposal for interior alterations for new I.T. data room and roof top antenna installation - necessary in advance for FIFA

  3. Building Demolition

    The early works scope includes rerouting all horizontal storm water pipes currently located beneath the 1970’s trainshed and reroutes toward the north. This rerouting is intende…

  4. Building Renovation

    Proposal for interior alterations to replace and upgrade the Great Hall Chandeliers - Union Station

  5. Building New Build

    REV: The revision include the removal of ramp T202 and associated partitions, a revision to a west partition to become exterior wall GB9, a revision to the door schedule, door B…

  6. Building New Build

    FS - Sprinkler Shop Drawing - Construction of new platforms, with canopies and vertical access elements, such as stairs and elevators and a new concourse area below the new plat…

  7. Building Renovation

    FS - Sprinkler Shop Drawing - Construct interior alterations to security office (Union Station)

  8. Building New Build

    HVAC - First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929 wall opening, construc…

View older filings (32)
  1. Plumbing - First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929 wall opening, cons…

  2. INSTALLATION OF NEW NON-LOCKABLE SEMI-TRANSPARENT ROLLER SCREEN IN OPEN MARKET BOOTH. REFER TO ALTERNATIVE SOLUTION 20 107565 ALT 00

  3. Installation of multi-media artwork in historic carraigeway space in Union Station Moat, and associated sprinkler and electrical modifications

  4. HVAC - Construction of new platforms, with canopies and vertical access elements, such as stairs and elevators and a new concourse area below the new platforms that will connect…

  5. Plumbing - Construction of new platforms, with canopies and vertical access elements, such as stairs and elevators and a new concourse area below the new platforms that will co…

  6. 25 152117 PSA

    Repair to Greywater System

  7. Plumbing - Construct interior alterations to security office (Union Station)

  8. HVAC - Construct interior alterations to security office (Union Station)

  9. Construct interior alterations to security office (Union Station)

  10. Plumbing - Proposal for interior alterations for Uniqlo in CRU 410

  11. HVAC - Proposal for interior alterations for Uniqlo in CRU 410

  12. Proposal for interior alterations for Uniqlo in CRU 410

  13. REV 02 - Revision to sprinkler drawings - Revision to permit due to elevation change to sprinkler layout in the Truck Tunnel. REV 01 - Revision descriped in application formThe…

  14. FS - Sprinkler Shop Drawing - First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929…

  15. REV 01 - Revision to sump pump schedule, room layout updates, underground plumbing updates and plumbing riser diagramDrain - Construction of new platforms, with canopies and ver…

  16. REVISION 01: This revision includes the proposed addition of dining room and modification of doors.Interior atlerations for unit CRU 107 for new restaurant - occupancy for 164 -…

  17. Provide cold water supply to hot water high pressure washer complete with a backflow preventer

  18. REV 01 - Revision description in application formThe scope of work includes the removal and isolation of existing mechanical, electrical, IT and security infrastructure in the l…

  19. Provide cold water supply to hot water high pressure washer complete with a backflow preventer

  20. REV 01 - Revision described in application formThe scope of work includes the removal and isolation of existing mechanical, electrical, IT and security infrastructure in the low…

  21. Plumbing - Interior atlerations for unit CRU 107 for new restaurant - occupancy for 164 - Bovine Wine Club

  22. HVAC - Interior atlerations for unit CRU 107 for new restaurant - occupancy for 164 - Bovine Wine Club

  23. REVISION - modify ductwork in ceiling at cash area, proposed floating gypsum board celing to be installed above cash areaHVAC - Interior alterations - Cookie Retail Shop - Craig…

  24. Plumbing - Proposed interior fit-out of vacant unit in food court.

  25. Proposed interior fit-out of vacant unit in food court.

  26. Plumbing - Proposal to construct interior alterations to Lids retail store

  27. HVAC - Proposal to construct interior alterations to Lids retail store

  28. HVAC - Proposed installation of signage , tv screens and lighting to TD Union Comfort Spot 3.

  29. Proposal to construct interior alterations to Lids retail store

  30. Revision to Plumbing - new mop sink provided at the rear and handwash sink located to the northern part of the counter top - Craig's Cookies - CRU 323

  31. Interior alterations - Cookie Retail Shop - Craig's Cookies - CRU 323

  32. Proposed installation of signage , tv screens and lighting to TD Union Comfort Spot 3.

Activity continuity summary

245 commercial filings observed

Since 1999

Most filings were institutional-related

Tier 2 category mix

Recent activity visible across multiple years

Spans 1999–2026

Related contractors

Business emergence insights

Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.

Nearby related activity

Explore neighbourhood activity
  • Commercial activity observed across St Lawrence-East Bayfront-The Islands.
  • Multiple interior renovations in the surrounding blocks.
  • Patio and signage activity consistent along the corridor.