Back to Winnipeg

233 Bonaventure Dr W

City of Winnipeg

2 permits
since 2018
Mar 22, 2021
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2018
2019
2020
2021
  1. 2021

    1 filing
    View permits (1)
    1. Mar 22, 2021

  2. 2018

    1 filing
    View permits (1)
    1. Oct 3, 2018

      Hilton Homes (2007) Ltd

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

18 locations shown

  • 1

    227 Bonaventure Drive W

    Renovation ×2
    22 m
  • 2

    63 Crimson Way

    Renovation
    58 m
  • 3

    56 Crimson Way

    New Build ×2
    88 m
  • 4

    61 Bow Water Dr

    Renovation
    102 m
  • 5

    199 Bonaventure Drive W Unit199

    Renovation
    103 m
  • 6

    57 Bow Water Dr

    Renovation
    108 m
  • 7

    40 Bow Water Drive

    Renovation
    116 m
  • 8

    41 Bow Water Drive

    New Build
    141 m
  • 9

    281 Bonaventure Drive W

    New Build
    149 m
  • 10

    20 Crimson Way

    Renovation
    165 m
  • 11

    35 Geneva Lane

    Renovation
    167 m
  • 12

    16 Crimson Way

    New Build
    175 m
  • 13

    27 Geneva Lane

    New Build
    184 m
  • 14

    31 Montvale Crescent

    Renovation
    213 m
  • 15

    57 Thelon Way

    New Build
    219 m
  • 16

    82 Thelon Way

    Renovation ×2
    238 m
  • 17

    12 Geneva Lane

    New Build
    239 m
  • 18

    76 Thelon Way

    Renovation
    242 m
8

New Build

13

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

233 Bonaventure Dr W in Winnipeg has 2 building permits on record dating back to 2018, most recently on March 22, 2021.