60 Bow Water Dr
City of Winnipeg
- 2 permits
- since 2017
- Jul 10, 2019
- Most recent permit
Building permit timeline
Year-grouped permit history. Permits collapse under each year.
-
2019
1 filingView permits (1) Hide permits
-
Jul 10, 2019
-
-
2017
1 filingView permits (1) Hide permits
Active contractors at this address
Contractors who have filed permits at this address.
Nearby Construction
Within 250 mActive and recent construction within 250 m of this address.
17 locations shown
-
1
36 m
63 Crimson Way
Renovation -
2
48 m
227 Bonaventure Drive W
Renovation ×2 -
3
54 m
61 Bow Water Dr
Renovation -
4
55 m
57 Bow Water Dr
Renovation -
5
64 m
40 Bow Water Drive
Renovation -
6
82 m
199 Bonaventure Drive W Unit199
Renovation -
7
82 m
41 Bow Water Drive
New Build -
8
90 m
56 Crimson Way
New Build ×2 -
9
144 m
20 Crimson Way
Renovation -
10
153 m
16 Crimson Way
New Build -
11
161 m
35 Geneva Lane
Renovation -
12
173 m
27 Geneva Lane
New Build -
13
191 m
281 Bonaventure Drive W
New Build -
14
228 m
30 Bonaventure Dr W
New Build -
15
230 m
2 addresses at this point
New Build Renovation -
16
233 m
57 Thelon Way
New Build -
17
235 m
12 Geneva Lane
New Build
New Build
Renovation
Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg
Nearby active addresses
Direct next steps for exploration.
-
61 Bow Water Dr
54m1 recent · 5 total
1 filing in the last 12 months, latest Feb 2026
-
57 Bow Water Dr
55m1 recent · 3 total
1 filing in the last 12 months, latest Sep 2025
-
57 Crimson Way
43m4 filings
Last filed Jun 2021
-
52 Bow Water Dr
27m2 filings
Last filed Mar 2022
-
63 Crimson Way
36m2 filings
Last filed Apr 2025
60 Bow Water Dr in Winnipeg has 2 building permits on record dating back to 2017, most recently on July 10, 2019.