In Strathcona: 1 permit in the last 7 days · General-heavy . See area activity →
Field Review - Addition / Alteration - #210 - Print Shop #220 - Production Studio Interior alterations to demising this existing unit into two units and change one of the newly created units to Print Shop and provide tenant improvements to both units on the 2nd floor of this existing commercial building. Scope of work: - Install demising wall, interior walls & doors, plumbing fixtures and electrical work. Schedule B Architectural - Emanuele Trinca Colonel, 604-728-7024,[email protected] Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
807 Powell St, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Manny Trinca DBA: Trinca Architecture
View all →More opportunities in Strathcona this week
View all →807 Powell St, Vancouver, BC, Vancouver
Show on map with nearby permits PRO