Field Review - Addition / Alteration - #600 - 6th Floor (demised and chged into #601 & #651) * SEE REVISION #1 for Revised Unit numbers. Changed to #600 and #650 Interior alterations to provide tenant improvements and to demise office unit #600 into two units (#601 and #651) in this existing commercial building on this site. Scope of work: Demise single floor into two separate tenant suites. Selective demolition of partitions, doors, millwork, ceiling & lighting. New construction for demising walls, entry doors, corridor ceiling and lighting. Electrical, HVAC and sprinklers to suit. REVISION #1 - change demising wall locations. change unit no's to #600 and #650. Oct 30/25 mk Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Rosa Salcido, Architect, AIBC., 778.389.4904\t\t Electrical Schedule B by Bin Ou-Yang, P.Eng., 604.569.6500\t\t Plumbing/Mechanical Schedule B by Nathan Young, P. Eng., 604.684.5995\t\t Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
1095 W Pender St, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by Elizabeth Servage DBA: 34 F Design
View all →More opportunities in Downtown this week
View all →1095 W Pender St, Vancouver, BC, Vancouver
Show on map with nearby permits PRO