CanPermits
Back to Yonge-Bay Corridor

199 Bay St

Yonge-Bay Corridor · City of Toronto

Office Restaurant Retail

1056

Permits observed

Since 1993

1993

Active since

First filing: Oct 1993

May 15, 2026

Latest filing

0

Contractors involved

Across all filings

Permit timeline

Chronological history of commercial permits and filings.

  1. Building New Build

    Plumbing - Proposal for interior alterations for new offices for DW Healthcare. Floor 47

  2. Building New Build

    HVAC - Proposal for interior alterations for new offices for DW Healthcare. Floor 47

  3. Building Demolition

    HVAC - Proposed interior alterations. Scope includes demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/finish…

  4. Building Demolition

    Plumbing - Proposed interior alterations. Scope includes demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/f…

  5. Building New Build

    Proposed interior alterations of partition walls for new meeting rooms, private offices, and lunch room.Scope of work includes changes to lighting, hvac, plumbing, sprinkler hea…

  6. Building New Build

    Plumbing - Proposed interior alterations of partition walls for new meeting rooms, private offices, and lunch room.Scope of work includes changes to lighting, hvac, plumbing, s…

  7. Building New Build

    HVAC - Proposed interior alterations of partition walls for new meeting rooms, private offices, and lunch room.Scope of work includes changes to lighting, hvac, plumbing, sprink…

  8. Building New Build

    Proposal for interior alterations for new offices for DW Healthcare. Floor 47

View older filings (32)
  1. HVAC - Proposal for interior tenant fit out.

  2. Plumbing - Proposal for interior tenant fit out. Unit 134C

  3. Plumbing - NEW OFFICES FOR IRONBRIDGE EQUITY PARTNERS (BLD, HVA, PLB PERMITS REQUIRED)

  4. NEW OFFICES FOR IRONBRIDGE EQUITY PARTNERS (BLD, HVA, PLB PERMITS REQUIRED)

  5. HVAC - NEW OFFICES FOR IRONBRIDGE EQUITY PARTNERS (BLD, HVA, PLB PERMITS REQUIRED)

  6. Installation of 3 new electromagnetic door locks.

  7. 26 140912 BLD

    Proposal for interior tenant fit out.

  8. Proposal for addition of cooling unit for LAN room.

  9. Plumbing - Proposed interior alterations 8th Floor.

  10. 26 131970 BLD

    Proposed interior alterations 8th Floor.

  11. HVAC - Proposed interior alterations 8th Floor.

  12. Proposed interior alterations. Scope includes demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/finish refres…

  13. REVISION 2 - revised layout including doors and washroomsHVAC - Proposal for addition and interior alteration

  14. REV 01: Changes to layout Addition of a new demising partition to divide suite 4700 and addition of zero hour rated partitions to new suite 4700.

  15. Plumbing - Proposal for interior alterations to an existing commericial office and retail banking space, CIBC Commerce Court (West), Concourse Level

  16. Proposal for interior alterations to an existing commericial office and retail banking space, CIBC Commerce Court (West), Concourse Level

  17. HVAC - Proposal for interior alterations to an existing commericial office and retail banking space, CIBC Commerce Court (West), Concourse Level

  18. Proposal for installation of 1 double door maglock on the 10th floor.

  19. Feb 5, 2026

    new fire pump

    26 101382 FSU

    new fire pump

  20. Proposal to install 15 maglocks on main level and secondary.

  21. Proposal for exterior alterations to the existing forecourt and courtyard, including landscape scope and remediation of waterproofing below existing pavers. Electrical and mecha…

  22. Proposed interior alterations including demolition of interior partitions and construction of new.- SUITE 1800

  23. Plumbing - Proposed interior alterations including demolition of interior partitions and construction of new.- SUITE 1800

  24. HVAC - Proposed interior alterations including demolition of interior partitions and construction of new.- SUITE 1800

  25. HVAC - Interior alterations of existing take-out restaurant within food court on concourse level.

  26. Plumbing - Interior alterations of existing take-out restaurant within food court on concourse level.

  27. REVISION - add one fire hose cabinet Proposal to install sprinklers in existing office space on the 31st Floor.

  28. Interior alterations of existing take-out restaurant within food court on concourse level.

  29. REVISION 01: PROPOSED LAYOUT REVISIONS TO END TRIP FACILITIESPlumbing - Proposal for addition and interior alteration

  30. Revision 1: Revised scope of project to include only the following areas: 1. P3 North west sprinkler system; 2. P1 South west sprinkler system; 3. Loading Dock dry sprinkler sys…

  31. Proposal for addition and interior alteration

  32. Plumbing - Interior alteration and infill at west building lobby & interior alteration at concourse lobby.

Activity continuity summary

1056 commercial filings observed

Since 1993

Most filings were office-related

Tier 2 category mix

Recent activity visible across multiple years

Spans 1993–2026

Within the last 90 days, a business has been emerging at this address — 7 business-emergence signals recorded.

Add this address's neighbourhood to a territory to see details (operating name, source category, lifecycle dates).

Business emergence insights

Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.

Nearby related activity

Explore neighbourhood activity
  • Commercial activity observed across Yonge-Bay Corridor.
  • Multiple interior renovations in the surrounding blocks.
  • Patio and signage activity consistent along the corridor.