30 Wellington St W
Yonge-Bay Corridor · City of Toronto
34
Permits observed
Since 2007
2007
Active since
First filing: May 2007
Mar 10, 2026
Latest filing
—
0
Contractors involved
Across all filings
Permit timeline
Chronological history of commercial permits and filings.
-
25 227574 BLDBuilding New Build
REV 01: Revision to floor plans, notes and details.Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
-
25 227574 HVABuilding New Build
REV 01: Revision to floor plans, notes and details.HVAC - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
-
25 227574 PLBBuilding New Build
Plumbing - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
-
25 199543 BLD
Sep 17, 2025
Proposed interior alterations to an existing office
Building RenovationProposed interior alterations to an existing office
-
25 214661 BLDBuilding Renovation
Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project.
-
25 139894 FSU
Apr 15, 2025
Proposal to install 3 stairwell maglocks.
Building OtherProposal to install 3 stairwell maglocks.
-
24 233296 FSUBuilding Other
Proposal to install 3 single maglocks on 2, 3 single maglocks on 3 and 3 single maglocks on 4 at the stairwell doors.
-
24 200675 PLBBuilding Renovation
Plumbing - Proposal for Back to Base and Washroom Renovation Floor 5
View older filings (26)
-
24 200675 BLD
Proposal to return the existing 5th floor office level to base building condition. Scope includes washroom renovation. [Commerce Court - South Building]
-
23 233896 BLD
REV 02 - TO REFLECT LOCATION OF ADULT CHANGING TABLE AS PER BLD INSPECTOR'S REQUEST. ADDED STRUCT ENG DWGS.REV 01 - adding washrooms to floors 2, 3 & 4Proposal for interior alte…
-
23 233896 PLB
Revision 01: adding washrooms to floors 2, 3 & 4Plumbing - Proposal for interior alterations - back to base on floors 2, 3 and 4
-
23 233896 HVA
HVAC - Proposal for interior alterations - back to base on floors 2, 3 and 4
-
17 210299 HVA
HVAC - INTERIOR ALTERATION TO GROUP 'D' OCCUPANCY
-
17 210299 BLD
INTERIOR ALTERATION TO EXISTING GROUP 'D' OCCUPANCY (OFFICE USE)
-
15 244538 PLB
Plumbing - Interior alterations to vacant space to create bicycle storage
-
15 244538 HVA
HVAC - Interior alterations to vacant space to create bicycle storage
-
15 244538 BLD
Interior alterations to vacant space to create bicycle storage
-
15 189389 HVA
HVAC - Proposed interior alterations to ground floor of existing office building with associated sprinkler work.
-
15 189389 BLD
Proposed interior alterations to ground floor of existing office building with associated sprinkler work.
-
07 270281 BLD
Jan 29, 2008
permit for new entrance canopy.
permit for new entrance canopy.
-
07 280763 FSU
Permit for 25 maglocks floors - 9 on floor 2 - 8 on floor 3 and 8 on floor 4
-
07 280911 PLB
Plumbing - Interior alterations to exisitng office space - Floor 2,3,4 - Deloitte.
-
07 280911 HVA
HVAC - Interior alterations to exisitng office space - Floor 2,3,4 - Deloitte.
-
07 280911 BLD
Interior alterations to exisitng office space - Floor 2,3,4 - Deloitte.
-
07 255485 BLD
Oct 22, 2007
Make interior alterations to ground floor lobby.
Make interior alterations to ground floor lobby.
-
07 255485 HVA
HVAC - Make interior alterations to ground floor lobby.
-
07 263473 FSU
Sprinkler permit for 07226129BLD - Fees Paid on on building permit
-
07 247810 FSU
Install 8 maglocks on 5th floor and 2 maglocks to 6th floor offices.
-
07 248911 MSA
Demo old and install new fresh air supply system on 6th floor Mechanical Room Penthouse.
-
07 226129 PLB
Plumbing - Interior alterations to ccreat new public WC's on 5th floor. Replace existing Drywall ceiling with T-Bar ceiling in portion only to 2nd, 3rd, 4th, 5th and 6th floors…
-
07 226129 BLD
Interior alterations to ccreat new public WC's on 5th floor. Replace existing Drywall ceiling with T-Bar ceiling in portion only to 2nd, 3rd, 4th, 5th and 6th floors. See previo…
-
07 191330 BLD
Interior demolition to existing office space - floor 2 to 6 - lloyds insurance
-
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.HVAC - Proposed interior alterations to an existing office
-
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.Plumbing - Proposed interior alterations to an existing office
Activity continuity summary
34 commercial filings observed
Since 2007
Most filings were office-related
Tier 2 category mix
Recent activity visible across multiple years
Spans 2007–2026
Business emergence insights
Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.
Nearby related activity
- ↗ Commercial activity observed across Yonge-Bay Corridor.
- ↗ Multiple interior renovations in the surrounding blocks.
- ↗ Patio and signage activity consistent along the corridor.