CanPermits
Back to Yonge-Bay Corridor

30 Wellington St W

Yonge-Bay Corridor · City of Toronto

Office Warehouse Retail

34

Permits observed

Since 2007

2007

Active since

First filing: May 2007

Mar 10, 2026

Latest filing

0

Contractors involved

Across all filings

Permit timeline

Chronological history of commercial permits and filings.

  1. Building New Build

    REV 01: Revision to floor plans, notes and details.Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only

  2. Building New Build

    REV 01: Revision to floor plans, notes and details.HVAC - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only

  3. Building New Build

    Plumbing - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only

  4. Building Renovation

    Proposed interior alterations to an existing office

  5. Building Renovation

    Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project.

  6. 25 139894 FSU
    Building Other

    Proposal to install 3 stairwell maglocks.

  7. Building Other

    Proposal to install 3 single maglocks on 2, 3 single maglocks on 3 and 3 single maglocks on 4 at the stairwell doors.

  8. Building Renovation

    Plumbing - Proposal for Back to Base and Washroom Renovation Floor 5

View older filings (26)
  1. Proposal to return the existing 5th floor office level to base building condition. Scope includes washroom renovation. [Commerce Court - South Building]

  2. REV 02 - TO REFLECT LOCATION OF ADULT CHANGING TABLE AS PER BLD INSPECTOR'S REQUEST. ADDED STRUCT ENG DWGS.REV 01 - adding washrooms to floors 2, 3 & 4Proposal for interior alte…

  3. Revision 01: adding washrooms to floors 2, 3 & 4Plumbing - Proposal for interior alterations - back to base on floors 2, 3 and 4

  4. HVAC - Proposal for interior alterations - back to base on floors 2, 3 and 4

  5. HVAC - INTERIOR ALTERATION TO GROUP 'D' OCCUPANCY

  6. INTERIOR ALTERATION TO EXISTING GROUP 'D' OCCUPANCY (OFFICE USE)

  7. Plumbing - Interior alterations to vacant space to create bicycle storage

  8. HVAC - Interior alterations to vacant space to create bicycle storage

  9. Interior alterations to vacant space to create bicycle storage

  10. HVAC - Proposed interior alterations to ground floor of existing office building with associated sprinkler work.

  11. Proposed interior alterations to ground floor of existing office building with associated sprinkler work.

  12. 07 270281 BLD

    permit for new entrance canopy.

  13. Permit for 25 maglocks floors - 9 on floor 2 - 8 on floor 3 and 8 on floor 4

  14. Plumbing - Interior alterations to exisitng office space - Floor 2,3,4 - Deloitte.

  15. HVAC - Interior alterations to exisitng office space - Floor 2,3,4 - Deloitte.

  16. Interior alterations to exisitng office space - Floor 2,3,4 - Deloitte.

  17. Make interior alterations to ground floor lobby.

  18. HVAC - Make interior alterations to ground floor lobby.

  19. Sprinkler permit for 07226129BLD - Fees Paid on on building permit

  20. Install 8 maglocks on 5th floor and 2 maglocks to 6th floor offices.

  21. Demo old and install new fresh air supply system on 6th floor Mechanical Room Penthouse.

  22. Plumbing - Interior alterations to ccreat new public WC's on 5th floor. Replace existing Drywall ceiling with T-Bar ceiling in portion only to 2nd, 3rd, 4th, 5th and 6th floors…

  23. Interior alterations to ccreat new public WC's on 5th floor. Replace existing Drywall ceiling with T-Bar ceiling in portion only to 2nd, 3rd, 4th, 5th and 6th floors. See previo…

  24. Interior demolition to existing office space - floor 2 to 6 - lloyds insurance

  25. Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.HVAC - Proposed interior alterations to an existing office

  26. Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.Plumbing - Proposed interior alterations to an existing office

Activity continuity summary

34 commercial filings observed

Since 2007

Most filings were office-related

Tier 2 category mix

Recent activity visible across multiple years

Spans 2007–2026

Business emergence insights

Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.

Nearby related activity

Explore neighbourhood activity
  • Commercial activity observed across Yonge-Bay Corridor.
  • Multiple interior renovations in the surrounding blocks.
  • Patio and signage activity consistent along the corridor.