CanPermits
Back to Yonge-Bay Corridor

222 Bay St

Yonge-Bay Corridor · City of Toronto

Office Restaurant Retail

406

Permits observed

Since 1989

1989

Active since

First filing: Nov 1989

Mar 2, 2026

Latest filing

0

Contractors involved

Across all filings

Permit timeline

Chronological history of commercial permits and filings.

  1. Building Addition

    HVAC Diffuser additions and re-balancing and Hot water tank replacements.

  2. Building Addition

    HVAC Diffuser additions and re-balancing and Hot water tank replacements.

  3. Building Other

    Proposal to Install total of three (3) maglocks, on12th floor.

  4. Building Renovation

    Proposal for interior alterations to remove convenience stair.

  5. Building Renovation

    HVAC - Proposal for interior alterations at various locations (washroom, corridor, demising walls, elevator lobby and tenant spaces).

  6. Building New Build

    HVAC - PROPOSAL FOR INTERIOR ALTERATIONS FOR SINGLE TENANT ON LEVEL 7A (MEZZANINE). SCOPE OF WORK INCLUDES REMOVAL OF NON-LOADBEARING PARTITIONS, NEW WORKSTATIONS AND MINOR RE-…

  7. Building New Build

    PROPOSAL FOR INTERIOR ALTERATIONS FOR SINGLE TENANT ON LEVEL 7A (MEZZANINE). SCOPE OF WORK INCLUDES REMOVAL OF NON-LOADBEARING PARTITIONS, NEW WORKSTATIONS AND MINOR RE-ALIGNME…

  8. 24 218742 PSA
    Building

    Proposal to replace back flow preventor

View older filings (32)
  1. ADDITION OF NEW PORTABLE AC UNIT WITH CONDENSATE PUMP

  2. HVAC - INTERIOR ALTERATIONS FOR COMPUTER NETWORK ROOM

  3. INTERIOR ALTERATIONS FOR COMPUTER NETWORK ROOM

  4. HVAC - Proposal to construct interior alterations to a single tennant on floor 11

  5. Tower #5 Fire Tank Refurbishment -’ Flow Meter Supply/Installation. The scope of work is to install a flow meter and associated control valves on the discharge side of the Mecha…

  6. Proposal for minor interior alterations to a small portion of the 7th floor level for an existing office tenant - 'TD Securities'.

  7. Plumbing - Interior alterations to existing offices in Unit 1750 - Skadden

  8. HVAC - Interior alterations to existing offices in Unit 1750 - Skadden

  9. Proposal for interior alterations to portions of existing Unit 1750, located on the 17th floor level, for existing office tenant - 'Skadden'.

  10. 23 221564 HVA

    HVAC - Proposed interior Alterations

  11. Proposal for interior alterations to a portion of the existing 19th floor level - unit 1900, for office tenant - "SAP Toronto'.

  12. Plumbing - Proposed interior alterations in unit 1400

  13. HVAC - Proposed interior alterations in unit 1400

  14. Proposal for minor interior alterations to portions of existing office unit 1400, located on the 14th floor level for tenant - 'SMBC Group'.

  15. Proposal for existing 6 Electromagnetic locks to be removed and reinstalled, and installation of new Power supplies used to power said mag locks

  16. Install single maglock to existing building - Unit 2500

  17. propose to replace three exterior exit doors on the ground floor level of Tower 5 including new metal doors, D5A, D5B and D5C, with vision panels, remove the magnetic locks. On…

  18. HVAC - Existing Bank space to be demolished. Tenant space to go back to base building

  19. Proposal for interior alterations (return to base) to an existing CRU (TD Bank ATM) on the concourse level - Unit E5A.

  20. Proposed installation of 1 new maglock. Suite 2720.

  21. Plumbing - Interior alterations to an existing vacant floorplate including HVAC andplumbing modifications, includes an internal stair connecting floors 24 & 25

  22. HVAC - Interior alterations to an existing vacant floorplate including HVAC andplumbing modifications, includes an internal stair connecting floors 24 & 25

  23. Proposal for interior alterations for a new office tenant - 'Avison Yonge Toronto' on the existing 24th (part) & 25th floor levels. Work includes a new interconnecting stair b/…

  24. Revision 01. existing 11F elevator lobby to remain as is, 15F elevator doors, ceiling finishes to be rebuild to match 11F, affect are 485sf. (45 sm)HVAC - Proposal for interior…

  25. Plumbing - Demolition of mechanical work in office, removal of existing AC unit and ductwork, remove and replace sprinkler heads

  26. HVAC - Demolition of mechanical work in office, removal of existing AC unit and ductwork, remove and replace sprinkler heads

  27. Revision 01. existing 11F elevator lobby to remain as is, 15F elevator doors, ceiling finishes to be rebuild to match 11F, affect are 485sf. (45 sm)[interior alterations to de-c…

  28. Demolition of mechanical work in office, removal of existing AC unit and ductwork, remove and replace sprinkler heads

  29. Plumbing - Proposal for interior alterations to elevator lobby, corridor, washrooms and suite demising partitions.

  30. HVAC - Proposal for interior alterations to elevator lobby, corridor, washrooms and suite demising partitions.

  31. Proposal for interior alterations to elevator lobby, corridor, washrooms and suite demising partitions.

  32. Plumbing - Interior alteration for a new office tenant-Comerica(Unit 2720)

Activity continuity summary

406 commercial filings observed

Since 1989

Most filings were office-related

Tier 2 category mix

Recent activity visible across multiple years

Spans 1989–2026

Business emergence insights

Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.

Nearby related activity

Explore neighbourhood activity
  • Commercial activity observed across Yonge-Bay Corridor.
  • Multiple interior renovations in the surrounding blocks.
  • Patio and signage activity consistent along the corridor.